In the article, “Hotel New World Collapse,” Kayat (2012) described the theories and reasoning of this catastrophe. The author discussed about the history, chronology of events and various theories. According to “Chronology of Events,” (1987, as cited in Kayat, 2012), Kayat mentioned that various theories like internal explosions resulted by gas leakage or terrorism, defective building materials, poor soil foundation and additional live load were made. However, these phenomena were not the causes to the failure after further examination. Kayat also stressed that the failure was progressive and was due to initial inferior structure design and insufficient maintenance. As by Neale mentioned, (2001, as cited in Kayat, 2012), the building self-weight was overlooked in the calculations done by the engineers and draughtsman. Neale also stated that the calculations should been checked by a different professional engineer before submission.

The article addressed the causes of the catastrophe in a well-descripted manner. However, it failed to further elaborate the reasons behind improper drafting, methods of construction and improper maintenance which led to the change in legislation of building plans due to the building’s collapse.

First of all, Kayat should have stated the reasons behind improper drafting. Based on the article, it stated that the designers lacked the attention when noting the dimensions of the individual pillars. These errors were caused during design phase because the building was designed by unqualified draftsman rather than a specialised structural engineer. In the article (Untrained Man Drew the Plans, 1986), mentioned that Architect’s draughtsman Leong Shui Lung, had no formal licence but was yet hired without any external engineers to design the building. This meant that there was no one revaluating the drawings to spot the grave mistakes in calculations.

Secondly, Kayat did not include the lack of supervision that resulted in improper methods of construction. During construction, managing director of the building, Mr Ng Khong, Lim did not employ any personnel to supervise the site. This meant that during construction, many of the specifications did not match the actual plan of the building. The report “Collapse of Hotel New World,” which was presented to the president, stated that the construction falls short from the drawings which “compounded the inadequacy of the structural design.” Such example is during the construction, the positioning of the supports was misaligned and reinforcements provided in members were inadequate than specified in drawings. Furthermore, there had been a frequent change in sub-contractors due to abuse on workers by Mr Ng as they were paid poorly with their payments delayed; leaving them unsatisfied. In my opinion, these factors contributed in unsatisfactory means of construction.

Lastly, Kayat could have elaborated on the maintenance procedures that were incorrectly done. In the report “COLLAPSE OF HOTEL NEW WORLD,” it mentioned that there were signs of cracks and weaknesses that were found either in the walls, floors or supports. However, they were simply ignored or superficially patched up and no professional opinion was sought after. This meant that cracks proliferate which resulted in structure degradation. In my opinion, Mr Ng Khong Lim was ignorant and did little to none to the maintenance of the building.

In conclusion, even though the building collapsed due to inferior design as the main reason, there were factors that were needed to be emphasized to understand the full reason behind this disaster. Factors like untrained draftsman that drew the plans, lack of supervision during construction and incorrect maintenance procedures, reveals the need for implementation of new laws so as to prevent a catastrophe from happening again.


Revolvy, L. (n.d.). Hotel New World disaster. Retrieved February 03, 2018, from https://www.revolvy.com/main/index.php?s=Hotel New World disaster&item_type=topic

The Hotel New World Collapse Commerce Essay. (2015). Retrieved February 03, 2018, from https://www.ukessays.com/essays/commerce/the-hotel-new-world-collapse-commerce-essay.php

Thean, L.P., Vijiaratnam, A. , Lee, S.L., Broms, B.B., (1987). COLLAPSE OF HOTEL NEW WORLD. Retrieved February 03, 2018 from http://eservice.nlb.gov.sg/data2/BookSG/publish/2/2b6b1c5c-8918-433a-a41e-8d2be8451577/web/html5/index.html?opf=tablet/BOOKSG.xml&launchlogo=tablet/BOOKSG_BrandingLogo_.png&pn=5

Tan, A., (2013). RESILIENCE THROUGH HERITAGE 1: HOTEL NEW WORLD. National Heritage Board’s E-books Collection. Retrieved February 03, 2018, from nhb_ebook_hotel_new_world.pdf
Untrained man drew the plans. (1986). The Straits Times, p. 1. Retrieved February 03, 2018, from http://eresources.nlb.gov.sg/newspapers/Digitised/Article/straitstimes19860918.2.2


Comments

Popular posts from this blog

Interpersonal Conflict

Formal Introduction

Critical Reflection